Finally installed remote Maxwell AA 710 and base station. Works very well and gives me chain length in and out accurately. All connections are made in the anchor well and the hardest part was to glue the sensor to the underside of the chain wheel. The base station has capability of controlling the Bow thruster as well but I would have to run wires from the anchor well to the cabin floor. Any thoughts on how this is done and advice would be welcome.